Compare commits
1
Commits
main
...
397f4900b0
| Author | SHA1 | Date | |
|---|---|---|---|
|
|
397f4900b0 |
@@ -0,0 +1,12 @@
|
||||
id,incident_id,root_cause_ref,description,owner_user_id,department,due_date,priority,status,completed_at,verified_by,verified_at,effectiveness_recheck_date,created_at,effectiveness_recheck_round,owner_notes
|
||||
ebea1a0b-012d-4020-bedd-0fdd96964f8b,0f81a575-7fd8-4d3a-9686-15bcd0b5f0b6,poor handling,Safety Briefing,2fc47d6f-9123-4b43-8e0b-3074d025a21e,,2026-07-21,high,open,null,null,null,null,2026-07-21 11:03:45.751671+00,0,null
|
||||
aabf7638-aa54-4093-a463-8ca9c02f6b6d,5e1c7d85-9988-48c8-8526-e971cd160ac5,unfit to work,safety briefing,11e15405-6c83-4483-9060-733660f424ad,,2026-07-21,high,closed,2026-07-21 11:31:25.844+00,11e15405-6c83-4483-9060-733660f424ad,2026-07-21 11:34:36.827+00,2026-08-20,2026-07-21 11:21:28.817757+00,0,null
|
||||
4a48c2f0-6d5b-44a3-b2a0-5765909420ca,0f81a575-7fd8-4d3a-9686-15bcd0b5f0b6,poor handling,"Safety Briefing ",7b873070-9806-423e-b3a1-1817d4a3cc7e,,2026-07-21,high,closed,2026-07-22 12:01:50.802+00,11e15405-6c83-4483-9060-733660f424ad,2026-07-22 14:10:55.578+00,2026-08-21,2026-07-21 11:03:12.019957+00,0,null
|
||||
8b405b2f-c084-46d4-a43e-46ab5a924dfa,5e1c7d85-9988-48c8-8526-e971cd160ac5,"Minimum supervision from PIC, Unfit to Work","Safety Briefing
|
||||
MHE Refresher Training",8b4441d7-ef6b-49ea-94b1-28c8bbfb68cf,,2026-07-21,high,closed,2026-07-24 01:26:27.179+00,11e15405-6c83-4483-9060-733660f424ad,2026-07-24 05:06:21.863+00,2026-08-23,2026-07-21 07:58:49.92362+00,0,"Brief by : Safety Department
|
||||
Date : 23/7/2026
|
||||
Place: All warehouse except SC 11"
|
||||
688470a9-8107-4284-a395-ea95ab1bdc7f,5e1c7d85-9988-48c8-8526-e971cd160ac5,"minimum supervision, unfit to work ","safety briefing
|
||||
MHE Refresher training",11e15405-6c83-4483-9060-733660f424ad,,2026-07-23,high,closed,2026-07-24 05:06:05.654+00,11e15405-6c83-4483-9060-733660f424ad,2026-07-24 05:07:12.8+00,2026-08-23,2026-07-23 03:05:20.92003+00,0,"testing for new system update "
|
||||
4656183f-722c-427f-82c4-dcb08335d9aa,dee6e6bb-b3a4-4767-8b9f-1dd3626c8f82,insufficient lighting,"inspection whole area to ensure sufficient lighting for worker to do job safely
|
||||
change or service the spotlight to make sure it is working properly",11e15405-6c83-4483-9060-733660f424ad,,2026-07-24,high,open,null,null,null,null,2026-07-24 05:32:57.094077+00,0,null
|
||||
|
@@ -0,0 +1,8 @@
|
||||
id,reference_no,incident_type,site_id,zone_id,reported_by,reported_at,description,severity,status,injury_involved,asset_involved,medical_status,lost_days,closed_at,created_at,is_fatality,is_serious_bodily_injury,is_dangerous_occurrence,is_occupational_disease,triage_notes,triaged_by,triaged_at,type_details,embedding,truck_id
|
||||
0f81a575-7fd8-4d3a-9686-15bcd0b5f0b6,SC1-202607-0001,asset_damage,c244ec0a-d713-4f23-b2c7-cac3f6c2c19a,b5ac1078-4a49-4f9a-8be4-be59bb86824a,11e15405-6c83-4483-9060-733660f424ad,2026-07-14 02:59:33.578421+00,"Pada 6 Jun 2026, lebih kurang 6 petang, 1 forklift telah melanggar 1 kotak TV serial nombor HK0908 dan menyebabkan carton torn. barang dalam tidak mengalami kerosakan dan forklift dalam keadaan baik",1,investigating,false,false,null,null,null,2026-07-14 02:59:33.578421+00,false,false,false,false,"carton torn, this is operator error",11e15405-6c83-4483-9060-733660f424ad,2026-07-14 03:03:27.996+00,"{""equipment_id"":""FL 052""}",null,null
|
||||
85c44b0b-5b4e-43a1-8e85-b64e8e510b3e,SC3-202607-0001,asset_damage,0c6e5030-be63-4c1b-ba4a-9eb01c2c392d,d352cb7f-dfca-4b6c-b3be-9209566ed74a,11e15405-6c83-4483-9060-733660f424ad,2026-07-14 03:52:41.932775+00,"Pada 2 april 2026, lebih kurang jam 4 petang, Abu terlanggar struktur racking lalu racking roboh. Setakat jam 4.30, sebanyak 3 baris racking roboh , jumlah kerosakan barang pelanggan masih belum dikenalpasti. Abu tidak mengalami sebarang kecederaan",4,investigating,false,true,null,null,null,2026-07-14 03:52:41.932775+00,false,false,true,false,need to secure the incident area immediately,11e15405-6c83-4483-9060-733660f424ad,2026-07-14 03:55:21.047+00,"{""equipment_id"":""RT A23"",""loto_applied"":true}",null,null
|
||||
58e40574-738a-42ca-8478-1999963b2117,SC3-202607-0002,asset_damage,0c6e5030-be63-4c1b-ba4a-9eb01c2c392d,d352cb7f-dfca-4b6c-b3be-9209566ed74a,11e15405-6c83-4483-9060-733660f424ad,2026-07-14 07:45:56.883487+00,"2nd June 2026, 10.00 p.m, @Racking BA 320501 - Racking was collapsed due to a hit by RT (Ali, PIS123) during the picking tasks. By the time of PIC's arrival (Abu), 2 racking identified damaged and collapsed. No injury involved, however the cost of the goods damaged unidentified yet.",3,investigating,false,true,null,null,null,2026-07-14 07:45:56.883487+00,false,false,true,false,HSE arrived at the scene. Immediately clear the area for safety purpose,11e15405-6c83-4483-9060-733660f424ad,2026-07-14 07:47:25.267+00,"{""equipment_id"":""RT - A23""}",null,null
|
||||
2abb27a1-f541-47de-8dd2-22d2a7902dc6,SC9-202607-0001,injury,f326a6ca-5b3c-4ea6-b1e5-8f73a5c3e54f,c921179e-0055-4c2c-be6d-80a48a8c89c2,11e15405-6c83-4483-9060-733660f424ad,2026-07-14 09:24:15.649656+00,"AT 08:00AM, A staff member called ALI ( ID : SGH888 ) has been injured by stepping on pallet nail on his left foot during picking at location AN at SC09. There weren't any damage for the pallet. We has been sent to nearest clinic for further medication",2,investigating,true,false,first_aid,null,null,2026-07-14 09:24:15.649656+00,false,false,false,false,"got mc for one day ",11e15405-6c83-4483-9060-733660f424ad,2026-07-14 09:25:44.752+00,null,null,null
|
||||
bcc0f0a3-aa34-4152-b2e4-5a67d5720403,SC5-202607-0001,injury,3419dfd1-f705-4be4-8d63-9cde3b95c62e,02dbe610-5252-4f7d-bfa7-cf5255c9ce1f,11e15405-6c83-4483-9060-733660f424ad,2026-07-14 05:42:02.469274+00,"Pada 3 jun 2026, jam 4 petang, pemandu forklift terlanggar seorang pekerja dibahagian sisi badan kiri semasa menjalankan kerja unloading barang dari dalam kontena. pekerja yang dilanggar mengadu sakit bahagian badan kiri, PIC segera membawa pekerja tersebut ke hospital berdekatan. Operator forklift tersebut melarikan diri kerana khuatir dengan kejadian tersebut.",3,triaged,true,false,medical_treatment,null,null,2026-07-14 05:42:02.469274+00,false,false,false,false,null,11e15405-6c83-4483-9060-733660f424ad,2026-07-17 02:26:56.032+00,null,null,null
|
||||
5e1c7d85-9988-48c8-8526-e971cd160ac5,SC1-202607-0002,asset_damage,c244ec0a-d713-4f23-b2c7-cac3f6c2c19a,b5ac1078-4a49-4f9a-8be4-be59bb86824a,11e15405-6c83-4483-9060-733660f424ad,2026-07-16 01:30:49.228419+00,"pada 2 jun 2026 , ali terlanggar sebuah aircond semasa menjalankan kerja unloading dari kontena ke staging. PIC datang ke tempat kejadian untuk mengawal situasi dengan mengalihkan barang ke tempat selamat dan ali direhatkan dari tugas forklift (MHE)",1,closed,false,true,null,null,2026-07-24 05:14:56.957+00,2026-07-16 01:30:49.228419+00,false,false,false,false,null,11e15405-6c83-4483-9060-733660f424ad,2026-07-16 01:32:37.163+00,"{""equipment_id"":""RT25""}",null,null
|
||||
dee6e6bb-b3a4-4767-8b9f-1dd3626c8f82,SC3-202607-0003,asset_damage,0c6e5030-be63-4c1b-ba4a-9eb01c2c392d,d352cb7f-dfca-4b6c-b3be-9209566ed74a,11e15405-6c83-4483-9060-733660f424ad,2026-07-15 08:50:59.724576+00,"on 2 jun 2026, 10pm, ali hit racking then toppled. 2 item fall down during the time. PIC immediately comes to secure the scene.",4,investigating,false,true,null,null,null,2026-07-15 08:50:59.724576+00,false,false,false,false,"consider as high risk since involved structure ",11e15405-6c83-4483-9060-733660f424ad,2026-07-15 08:55:12.418+00,"{""equipment_id"":""RT 23"",""loto_applied"":true}",null,null
|
||||
|
@@ -0,0 +1,17 @@
|
||||
id,incident_id,investigator_id,method,findings_text,root_cause_summary,alcohol_test_result,witness_statement_refs,completed_at,created_at,five_why_steps,fishbone_categories,urine_test_result
|
||||
3883b700-f992-4f4f-a256-1b86934f32c5,0f81a575-7fd8-4d3a-9686-15bcd0b5f0b6,11e15405-6c83-4483-9060-733660f424ad,five_why,"1. 1. Implement mandatory quarterly forklift operator refresher training covering spatial awareness, load clearance, and zone discipline, with a practical assessment sign-off for each operator.
|
||||
2. 2. Conduct a 5S+Safety audit across the OPS zone: install yellow/red floor marking tapes or painted lines to define minimum clearance zones around high-value/itemised stock (e.g., TV boxes), and erect protective barriers or bollards in high-risk stacking areas.
|
||||
3. 3. Establish a formal near-miss and minor-damage reporting system (e.g., a simple WhatsApp-based or paper log) with a monthly review by the site supervisor to identify recurring patterns and trigger preventive actions before a more serious incident occurs.","The absence of a systematic HSE continuous improvement process—including regular operator refresher training, updated 5S/warehouse layout standards with clearance markings, and a near-miss reporting feedback loop—allowed an untrained behaviour (poor clearance judgment) to go uncorrected, resulting in a preventable collision with high-value goods.",negative,"[""Ali bin Abu - forklift driver - SGH . Dia mengaku bersalah kerana tidak nampak kotak tersebut semasa reverse untuk meletakkan barang yang unloading dari kontena ke staging inbound area""]",null,2026-07-14 03:14:59.037478+00,"[{""why"":""Why did the forklift collide with the TV box, causing a carton tear?"",""answer"":""The forklift operator misjudged the clearance distance while maneuvering near the TV box, causing the forklift tines or body to make contact with the carton.""},{""why"":""Why did the operator misjudge the clearance distance?"",""answer"":""The operator was not following proper spotting or lookout procedures, and the aisle/stacking area had no physical guides or marked safety zones to indicate minimum clearance from stored goods.""},{""why"":""Why were there no physical guides or marked safety zones for clearance?"",""answer"":""The warehouse layout did not include floor markings, barrier rails, or visual indicators for safe maneuvering distances in that specific stacking area, and there was no standardised process for auditing storage layout compliance.""},{""why"":""Why was the warehouse layout lacking proper markings and the operator not following safe procedures?"",""answer"":""There was no regular refresher training program for forklift operators focused on spatial awareness and zone discipline, and the facility's housekeeping and 5S standards had not been updated to include clearance safety requirements for high-value items.""},{""why"":""Why was there no refresher training and why were 5S standards not updated?"",""answer"":""Management had not prioritised periodic operator competency assessments or layout safety audits due to high operational pressure and a lack of a dedicated HSE feedback loop to capture near-misses and minor asset damage incidents for continuous improvement.""}]",null,null
|
||||
47c322c2-1911-4b6d-a263-fb91b9ab0a62,85c44b0b-5b4e-43a1-8e85-b64e8e510b3e,11e15405-6c83-4483-9060-733660f424ad,five_why,"1. 1. Implement a Management of Change (MOC) procedure requiring HSE & Operations sign-off for any racking layout, stock density, or aisle width changes, including a mandatory racking zone risk assessment update before the change is approved.
|
||||
2. 2. Install physical and tech-based controls in all MHE operating in racking zones: fit speed limiters/geo-fencing on all forklifts and reach trucks to cap speed at 5 km/h within 1 meter of any racking upright, plus install blue-spot safety lights and audible reverse alarms on all units.
|
||||
3. 3. Conduct a compulsory refresher retraining for all MHE operators on safe racking aisle maneuvering, approved clearances, speed discipline, and the consequences of racking impact, with a hands-on practical assessment and sign-off by a certified trainer.","The root cause was the absence of a formal management-of-change (MOC) process for warehouse layout modifications, combined with inadequate MHE safety controls (speed limiters, alarms, clear signage) and insufficient operator awareness of safe maneuvering speeds in racking aisles, leading to a high-speed impact that caused a progressive racking collapse.",positive,"[""semasa disoal siasat, Abu berada dalam keadaan mabuk ( mata merah, berbau arak dan tidak boleh berdiri dengan betul ). DIa mengaku dia telah minum minuman keras sebelum datang kerja kerana ajakan rakannya.""]",null,2026-07-14 03:58:34.001168+00,"[{""why"":""Why did Abu hit the racking structure, causing it to collapse?"",""answer"":""Abu was operating a forklift (or reach truck) and misjudged the clearance while maneuvering in the racking aisle, making direct contact with the upright of the racking system.""},{""why"":""Why did Abu misjudge the clearance while maneuvering in the racking aisle?"",""answer"":""Abu may have been driving too fast for the aisle conditions, was distracted, or the racking aisle was narrower than required for the type of material handling equipment (MHE) being used.""},{""why"":""Why was Abu driving too fast or distracted, and why was the aisle clearance inadequate?"",""answer"":""There was no effective speed governor or geo-fencing system on the forklift, no clear signage indicating speed limits in racking zones, and operators are under pressure to meet tight operational KPIs (picking/put-away targets). Additionally, racking aisle width and layout were not reassessed after recent warehouse layout changes or stock density increases.""},{""why"":""Why was there no effective speed control, signage, or layout reassessment in place?"",""answer"":""The warehouse operations team had not conducted a recent risk assessment for the racking zone after layout changes, and MHE safety features (speed limiters, alarms, or aisle clearance markers) were not included in the preventive maintenance or safety inspection schedule.""},{""why"":""Why was the risk assessment not updated and MHE safety features not inspected regularly?"",""answer"":""There was no formal procedure requiring re-assessment of racking zone risks after layout or inventory density changes, and the HSE team was not notified of the modifications. Additionally, the MHE preventive maintenance checklist did not include verification of speed limiters or geo-fencing functionality.""}]",null,null
|
||||
deb1c4f0-cf3c-4847-9718-c9748662f0a4,58e40574-738a-42ca-8478-1999963b2117,11e15405-6c83-4483-9060-733660f424ad,five_why,"Sleepy during that time due to take medicine before work start. ","operator negligence and unfit to work
|
||||
PIC didnt supervisor his properly during briefing before work start",positive,"[""Ali - RT driver - PIS. He confess he was sleepy during that time. He didnt realize during that time he suddenly microsleep""]",null,2026-07-14 07:56:27.256602+00,[],null,null
|
||||
64bc48a6-e6aa-4dad-ab9a-91c73bfaabad,2abb27a1-f541-47de-8dd2-22d2a7902dc6,11e15405-6c83-4483-9060-733660f424ad,five_why,"1. 1. Implement a Pre-Staging Pallet Inspection SOP: Mandate that all pallets entering the staging area must undergo a visual and tactile inspection (check for protruding nails, broken boards, and splinters) by the receiving or staging team before being released for picking. Use a simple checklist and colour-coded tags (green = safe, red = reject). Assign ownership to the Staging Team Leader.
|
||||
2. 2. Introduce mandatory PPE reinforcement & provide puncture-resistant safety shoes: Reinforce the PPE policy requiring all warehouse staff to wear approved safety shoes with steel-toe caps and puncture-resistant soles. Conduct a toolbox talk within 48 hours. Consider procuring and subsidising appropriate safety footwear for all picking and staging staff.
|
||||
3. 3. Establish a Hazard Identification and Near-Miss Reporting System: Roll out a simple digital or paper-based hazard reporting form (e.g., via WhatsApp group or notice board) for workers to report damaged pallets, protruding nails, or near-miss incidents. Ensure management reviews reports weekly and assigns corrective actions within 24 hours. Include this in the monthly HSE committee meeting agenda.","The absence of a formal pallet inspection SOP and lack of assigned ownership for pallet condition checks, driven by insufficient management priority on preventive safety controls and an inadequate hazard identification process, allowed a damaged pallet with a protruding nail to be staged in the picking area, resulting in a preventable foot injury to a worker.",null,[],null,2026-07-14 09:27:59.492206+00,"[{""why"":""Why did Ali step on a pallet nail and injure his left foot?"",""answer"":""Because a nail was protruding from a pallet located in the staging area at location AN, and Ali stepped on it while walking through the area during his picking task.""},{""why"":""Why was there a protruding nail on the pallet in the staging area?"",""answer"":""Because the pallet was not inspected or maintained before being placed in the staging area, and there is no routine pallet integrity check process before pallets are staged for picking operations.""},{""why"":""Why was there no routine pallet inspection process before staging pallets?"",""answer"":""Because the warehouse does not have a formal Pre-Staging Pallet Inspection Standard Operating Procedure (SOP), and the responsibility for checking pallet condition is not clearly assigned to any team or individual.""},{""why"":""Why is there no formal pallet inspection SOP or clear ownership for pallet condition checks?"",""answer"":""Because management has not prioritised pallet maintenance and inspection as a critical safety control, and existing resources are focused primarily on productivity metrics rather than preventive safety measures.""},{""why"":""Why has management not prioritised pallet inspection as a critical safety control despite the known risk of nail injuries?"",""answer"":""Because there is no systematic hazard identification and risk assessment (HIRARC) process that specifically addresses pallet-related foot injury hazards, and past near-misses or minor injuries were not formally reported or escalated to drive corrective action.""}]",null,null
|
||||
71da7df7-110b-475e-a08a-8c1716ac7351,5e1c7d85-9988-48c8-8526-e971cd160ac5,11e15405-6c83-4483-9060-733660f424ad,five_why,"1. Conduct a HIRARC (Hazard Identification, Risk Assessment & Risk Control) for all MHE-operating zones including container unloading areas, with specific focus on fixed asset collision hazards, and implement identified controls such as physical barriers (e.g., bollards or guardrails) around fixed assets within 2 metres of MHE pathways.
|
||||
2. Develop a Warehouse Layout Standard (based on MS 1722 or DOSH guidelines) that defines minimum clearances for MHE operations, designated MHE travel lanes, and exclusion zones around building infrastructure (columns, air conditioners, electrical panels). Mark these zones with high-visibility floor tape and signage.
|
||||
3. Implement a pre-operation 'walk-around' inspection checklist for forklift operators that includes verification of clear path and awareness of fixed assets in the work area, and reinforce through weekly toolbox talks and a refresher training on safe MHE manoeuvring and spatial awareness.","The root cause is the absence of a systematic risk assessment and layout review process for the container unloading zone, leading to unprotected fixed assets (air conditioner) placed within the MHE operating envelope without physical barriers or designated exclusion zones.",positive,"[""ali mengaku dia telah ambil ubat batuk sebelum kerja menyebabkan dia mengantuk semasa bertugas""]",null,2026-07-16 01:35:43.588893+00,"[{""why"":""Why did Ali hit the air conditioner while unloading from the container to the staging area?"",""answer"":""Ali lost control or misjudged the distance while manoeuvring the forklift, causing it to collide with the air conditioning unit located near the unloading bay.""},{""why"":""Why did Ali lose control or misjudge the distance?"",""answer"":""The staging area near the container unloading bay had limited clearance, and the air conditioner was positioned within the forklift's operating zone without adequate physical barriers or markings.""},{""why"":""Why was the air conditioner placed in a location with limited clearance and no barriers?"",""answer"":""There was no designated exclusion zone or protective guarding for fixed assets (e.g., air conditioners) in the unloading area, and the layout did not account for forklift turning radius and load overhang.""},{""why"":""Why was there no designated exclusion zone or protective guarding for fixed assets in the unloading area?"",""answer"":""A formal risk assessment (HIRARC) had not been conducted for the container unloading zone to identify fixed asset collision hazards, and there was no standard layout plan defining safe distances between MHE pathways and building infrastructure.""},{""why"":""Why was the HIRARC for the unloading zone not conducted or updated?"",""answer"":""The site's asset protection programme did not include periodic workplace layout reviews for MHE operations, and there was no systematic process to identify and protect fixed assets in high-traffic operational zones.""}]",null,null
|
||||
65035159-24d4-4081-a8da-80ffb6727816,dee6e6bb-b3a4-4767-8b9f-1dd3626c8f82,11e15405-6c83-4483-9060-733660f424ad,five_why,"- insufficient lighting
|
||||
- limited sight due to higher level",the main issue due to broken spotlight was not handled before starting the job on that area makes the area was not safe to work,negative,"[""ali said he cant see the area clearly due to insufficient lighting on that area. He already raise up the issues to PIC, but no corrective action was taken. Plus, the item was on level 5, which make it harder for him to see clearly without sufficient lighting on higher level""]",null,2026-07-24 05:29:59.060352+00,"[{""why"":""Why did the incident happen?"",""answer"":""ali cant see clearly on level 5\n""},{""why"":""why ali cant see clearly on level 5 ?"",""answer"":""because the racking area was dark ""},{""why"":""why the racking area was dark ?"",""answer"":""due to the insufficient lighting in that area""},{""why"":""why insufficient lighting in that area?"",""answer"":""due to few spotlight was not functioning""}]",null,negative
|
||||
|
@@ -0,0 +1,17 @@
|
||||
id,incident_id,investigator_id,method,findings_text,root_cause_summary,alcohol_test_result,completed_at,created_at,five_why_steps,fishbone_categories,urine_test_result
|
||||
3883b700-f992-4f4f-a256-1b86934f32c5,0f81a575-7fd8-4d3a-9686-15bcd0b5f0b6,11e15405-6c83-4483-9060-733660f424ad,five_why,"1. 1. Implement mandatory quarterly forklift operator refresher training covering spatial awareness, load clearance, and zone discipline, with a practical assessment sign-off for each operator.
|
||||
2. 2. Conduct a 5S+Safety audit across the OPS zone: install yellow/red floor marking tapes or painted lines to define minimum clearance zones around high-value/itemised stock (e.g., TV boxes), and erect protective barriers or bollards in high-risk stacking areas.
|
||||
3. 3. Establish a formal near-miss and minor-damage reporting system (e.g., a simple WhatsApp-based or paper log) with a monthly review by the site supervisor to identify recurring patterns and trigger preventive actions before a more serious incident occurs.","The absence of a systematic HSE continuous improvement process—including regular operator refresher training, updated 5S/warehouse layout standards with clearance markings, and a near-miss reporting feedback loop—allowed an untrained behaviour (poor clearance judgment) to go uncorrected, resulting in a preventable collision with high-value goods.",negative,null,2026-07-14 03:14:59.037478+00,"[{""why"":""Why did the forklift collide with the TV box, causing a carton tear?"",""answer"":""The forklift operator misjudged the clearance distance while maneuvering near the TV box, causing the forklift tines or body to make contact with the carton.""},{""why"":""Why did the operator misjudge the clearance distance?"",""answer"":""The operator was not following proper spotting or lookout procedures, and the aisle/stacking area had no physical guides or marked safety zones to indicate minimum clearance from stored goods.""},{""why"":""Why were there no physical guides or marked safety zones for clearance?"",""answer"":""The warehouse layout did not include floor markings, barrier rails, or visual indicators for safe maneuvering distances in that specific stacking area, and there was no standardised process for auditing storage layout compliance.""},{""why"":""Why was the warehouse layout lacking proper markings and the operator not following safe procedures?"",""answer"":""There was no regular refresher training program for forklift operators focused on spatial awareness and zone discipline, and the facility's housekeeping and 5S standards had not been updated to include clearance safety requirements for high-value items.""},{""why"":""Why was there no refresher training and why were 5S standards not updated?"",""answer"":""Management had not prioritised periodic operator competency assessments or layout safety audits due to high operational pressure and a lack of a dedicated HSE feedback loop to capture near-misses and minor asset damage incidents for continuous improvement.""}]",null,null
|
||||
47c322c2-1911-4b6d-a263-fb91b9ab0a62,85c44b0b-5b4e-43a1-8e85-b64e8e510b3e,11e15405-6c83-4483-9060-733660f424ad,five_why,"1. 1. Implement a Management of Change (MOC) procedure requiring HSE & Operations sign-off for any racking layout, stock density, or aisle width changes, including a mandatory racking zone risk assessment update before the change is approved.
|
||||
2. 2. Install physical and tech-based controls in all MHE operating in racking zones: fit speed limiters/geo-fencing on all forklifts and reach trucks to cap speed at 5 km/h within 1 meter of any racking upright, plus install blue-spot safety lights and audible reverse alarms on all units.
|
||||
3. 3. Conduct a compulsory refresher retraining for all MHE operators on safe racking aisle maneuvering, approved clearances, speed discipline, and the consequences of racking impact, with a hands-on practical assessment and sign-off by a certified trainer.","The root cause was the absence of a formal management-of-change (MOC) process for warehouse layout modifications, combined with inadequate MHE safety controls (speed limiters, alarms, clear signage) and insufficient operator awareness of safe maneuvering speeds in racking aisles, leading to a high-speed impact that caused a progressive racking collapse.",positive,null,2026-07-14 03:58:34.001168+00,"[{""why"":""Why did Abu hit the racking structure, causing it to collapse?"",""answer"":""Abu was operating a forklift (or reach truck) and misjudged the clearance while maneuvering in the racking aisle, making direct contact with the upright of the racking system.""},{""why"":""Why did Abu misjudge the clearance while maneuvering in the racking aisle?"",""answer"":""Abu may have been driving too fast for the aisle conditions, was distracted, or the racking aisle was narrower than required for the type of material handling equipment (MHE) being used.""},{""why"":""Why was Abu driving too fast or distracted, and why was the aisle clearance inadequate?"",""answer"":""There was no effective speed governor or geo-fencing system on the forklift, no clear signage indicating speed limits in racking zones, and operators are under pressure to meet tight operational KPIs (picking/put-away targets). Additionally, racking aisle width and layout were not reassessed after recent warehouse layout changes or stock density increases.""},{""why"":""Why was there no effective speed control, signage, or layout reassessment in place?"",""answer"":""The warehouse operations team had not conducted a recent risk assessment for the racking zone after layout changes, and MHE safety features (speed limiters, alarms, or aisle clearance markers) were not included in the preventive maintenance or safety inspection schedule.""},{""why"":""Why was the risk assessment not updated and MHE safety features not inspected regularly?"",""answer"":""There was no formal procedure requiring re-assessment of racking zone risks after layout or inventory density changes, and the HSE team was not notified of the modifications. Additionally, the MHE preventive maintenance checklist did not include verification of speed limiters or geo-fencing functionality.""}]",null,null
|
||||
deb1c4f0-cf3c-4847-9718-c9748662f0a4,58e40574-738a-42ca-8478-1999963b2117,11e15405-6c83-4483-9060-733660f424ad,five_why,Sleepy during that time due to take medicine before work start. ,"operator negligence and unfit to work
|
||||
PIC didnt supervisor his properly during briefing before work start",positive,null,2026-07-14 07:56:27.256602+00,[],null,null
|
||||
64bc48a6-e6aa-4dad-ab9a-91c73bfaabad,2abb27a1-f541-47de-8dd2-22d2a7902dc6,11e15405-6c83-4483-9060-733660f424ad,five_why,"1. 1. Implement a Pre-Staging Pallet Inspection SOP: Mandate that all pallets entering the staging area must undergo a visual and tactile inspection (check for protruding nails, broken boards, and splinters) by the receiving or staging team before being released for picking. Use a simple checklist and colour-coded tags (green = safe, red = reject). Assign ownership to the Staging Team Leader.
|
||||
2. 2. Introduce mandatory PPE reinforcement & provide puncture-resistant safety shoes: Reinforce the PPE policy requiring all warehouse staff to wear approved safety shoes with steel-toe caps and puncture-resistant soles. Conduct a toolbox talk within 48 hours. Consider procuring and subsidising appropriate safety footwear for all picking and staging staff.
|
||||
3. 3. Establish a Hazard Identification and Near-Miss Reporting System: Roll out a simple digital or paper-based hazard reporting form (e.g., via WhatsApp group or notice board) for workers to report damaged pallets, protruding nails, or near-miss incidents. Ensure management reviews reports weekly and assigns corrective actions within 24 hours. Include this in the monthly HSE committee meeting agenda.","The absence of a formal pallet inspection SOP and lack of assigned ownership for pallet condition checks, driven by insufficient management priority on preventive safety controls and an inadequate hazard identification process, allowed a damaged pallet with a protruding nail to be staged in the picking area, resulting in a preventable foot injury to a worker.",null,null,2026-07-14 09:27:59.492206+00,"[{""why"":""Why did Ali step on a pallet nail and injure his left foot?"",""answer"":""Because a nail was protruding from a pallet located in the staging area at location AN, and Ali stepped on it while walking through the area during his picking task.""},{""why"":""Why was there a protruding nail on the pallet in the staging area?"",""answer"":""Because the pallet was not inspected or maintained before being placed in the staging area, and there is no routine pallet integrity check process before pallets are staged for picking operations.""},{""why"":""Why was there no routine pallet inspection process before staging pallets?"",""answer"":""Because the warehouse does not have a formal Pre-Staging Pallet Inspection Standard Operating Procedure (SOP), and the responsibility for checking pallet condition is not clearly assigned to any team or individual.""},{""why"":""Why is there no formal pallet inspection SOP or clear ownership for pallet condition checks?"",""answer"":""Because management has not prioritised pallet maintenance and inspection as a critical safety control, and existing resources are focused primarily on productivity metrics rather than preventive safety measures.""},{""why"":""Why has management not prioritised pallet inspection as a critical safety control despite the known risk of nail injuries?"",""answer"":""Because there is no systematic hazard identification and risk assessment (HIRARC) process that specifically addresses pallet-related foot injury hazards, and past near-misses or minor injuries were not formally reported or escalated to drive corrective action.""}]",null,null
|
||||
71da7df7-110b-475e-a08a-8c1716ac7351,5e1c7d85-9988-48c8-8526-e971cd160ac5,11e15405-6c83-4483-9060-733660f424ad,five_why,"1. Conduct a HIRARC (Hazard Identification, Risk Assessment & Risk Control) for all MHE-operating zones including container unloading areas, with specific focus on fixed asset collision hazards, and implement identified controls such as physical barriers (e.g., bollards or guardrails) around fixed assets within 2 metres of MHE pathways.
|
||||
2. Develop a Warehouse Layout Standard (based on MS 1722 or DOSH guidelines) that defines minimum clearances for MHE operations, designated MHE travel lanes, and exclusion zones around building infrastructure (columns, air conditioners, electrical panels). Mark these zones with high-visibility floor tape and signage.
|
||||
3. Implement a pre-operation 'walk-around' inspection checklist for forklift operators that includes verification of clear path and awareness of fixed assets in the work area, and reinforce through weekly toolbox talks and a refresher training on safe MHE manoeuvring and spatial awareness.","The root cause is the absence of a systematic risk assessment and layout review process for the container unloading zone, leading to unprotected fixed assets (air conditioner) placed within the MHE operating envelope without physical barriers or designated exclusion zones.",positive,null,2026-07-16 01:35:43.588893+00,"[{""why"":""Why did Ali hit the air conditioner while unloading from the container to the staging area?"",""answer"":""Ali lost control or misjudged the distance while manoeuvring the forklift, causing it to collide with the air conditioning unit located near the unloading bay.""},{""why"":""Why did Ali lose control or misjudge the distance?"",""answer"":""The staging area near the container unloading bay had limited clearance, and the air conditioner was positioned within the forklift's operating zone without adequate physical barriers or markings.""},{""why"":""Why was the air conditioner placed in a location with limited clearance and no barriers?"",""answer"":""There was no designated exclusion zone or protective guarding for fixed assets (e.g., air conditioners) in the unloading area, and the layout did not account for forklift turning radius and load overhang.""},{""why"":""Why was there no designated exclusion zone or protective guarding for fixed assets in the unloading area?"",""answer"":""A formal risk assessment (HIRARC) had not been conducted for the container unloading zone to identify fixed asset collision hazards, and there was no standard layout plan defining safe distances between MHE pathways and building infrastructure.""},{""why"":""Why was the HIRARC for the unloading zone not conducted or updated?"",""answer"":""The site's asset protection programme did not include periodic workplace layout reviews for MHE operations, and there was no systematic process to identify and protect fixed assets in high-traffic operational zones.""}]",null,null
|
||||
65035159-24d4-4081-a8da-80ffb6727816,dee6e6bb-b3a4-4767-8b9f-1dd3626c8f82,11e15405-6c83-4483-9060-733660f424ad,five_why,"- insufficient lighting
|
||||
- limited sight due to higher level",the main issue due to broken spotlight was not handled before starting the job on that area makes the area was not safe to work,negative,null,2026-07-24 05:29:59.060352+00,"[{""why"":""Why did the incident happen?"",""answer"":""ali cant see clearly on level 5\n""},{""why"":""why ali cant see clearly on level 5 ?"",""answer"":""because the racking area was dark ""},{""why"":""why the racking area was dark ?"",""answer"":""due to the insufficient lighting in that area""},{""why"":""why insufficient lighting in that area?"",""answer"":""due to few spotlight was not functioning""}]",null,negative
|
||||
|
@@ -0,0 +1,6 @@
|
||||
id,name,email,phone,role,department,site_id,active,created_at
|
||||
11e15405-6c83-4483-9060-733660f424ad,Admin,admin@ims.local,null,admin,null,null,true,2026-07-12 05:20:06.471419+00
|
||||
39a0773b-86a2-4e3d-b3a5-4335bd3a9ee6,Test Admin,admin@ims-test.com,null,reporter,null,null,true,2026-07-09 22:30:17.135195+00
|
||||
8b4441d7-ef6b-49ea-94b1-28c8bbfb68cf,Nurul Huda Safiah,huda@setia.com.my,null,capa_owner,null,c244ec0a-d713-4f23-b2c7-cac3f6c2c19a,true,2026-07-16 04:22:45.44713+00
|
||||
2fc47d6f-9123-4b43-8e0b-3074d025a21e,Nurul Ain Athirah,athirah@setia.com.my,+60193357688,capa_owner,null,c244ec0a-d713-4f23-b2c7-cac3f6c2c19a,true,2026-07-20 06:35:17.362333+00
|
||||
7b873070-9806-423e-b3a1-1817d4a3cc7e,yap,whyap79@gmail.com,null,capa_owner,null,c244ec0a-d713-4f23-b2c7-cac3f6c2c19a,true,2026-07-18 09:07:28.001432+00
|
||||
|
Reference in New Issue
Block a user